The last minutes of Sprint Planning: let doubts speak

A doubt noted in the final minutes of planning resurfaces three weeks later. Four moves to surface it before the room empties.

At the bottom of the board, the last line added to the Sprint Backlog during Sprint Planning reads three words: “database migration, risky.” It is 11:52 and the room is emptying. That ticket will sit in the “to do” column until the last Wednesday of the Sprint, and that Wednesday is when the surprise lands.

If someone had a real concern, they would have said it: at 11:50, speaking up is expensive, and yet it decides what happens in the final five minutes of planning.

What a doubt that stays unsaid looks like

Take a team of five, a Tuesday, 11:40, in the last half hour of a two-hour Sprint Planning. The Sprint items are estimated, the total matches the usual velocity. The facilitator asks if there are any questions. Four seconds of silence. One voice answers: “no, should be fine.” At 11:52, the newest member writes “database migration, risky” on a ticket and puts it back in the column. Nobody reads it again until the following Tuesday, when the test database goes down.

That doubt would have taken half a sentence, with no numbers and no alternative to propose. The person holding it had no way to know whether it was worth interrupting a meeting that had just agreed on an estimate. Reopening a topic has a cost, and the cost is paid in front of the manager sitting at the back.

The silence has a more practical cause. Before the end of planning, the doubt has no object yet: nobody knows what the Sprint contains. It is in the final minutes, when the plan finally exists, that the concern finds something to attach to. Those minutes are the first in which the question makes sense, and often the ones in which nobody asks it.

What the Scrum Guide assigns to the Sprint Backlog

The Scrum Guide describes three topics for Sprint Planning: why the Sprint is valuable, what can be done, and how the work will be done [1]. None of the three is called risk. The guide assigns something else to the Sprint Backlog: a plan by and for the Developers, updated throughout the Sprint as soon as new information appears [1].

The Daily Scrum serves to inspect progress toward the Sprint Goal and adapt the Sprint Backlog [1]. A doubt can therefore be raised out loud at 9:15, and that is what usually happens. A doubt raised out loud leaves nothing in the plan: nobody writes it down, nobody follows it, and the person who voiced it has to repeat it every morning if they still care. After three days, they stop repeating it.

The guide makes transparency one of the three pillars of empiricism, alongside inspection and adaptation, and notes that inspection without transparency can be “misleading” [1]. A note on the back of a ticket is exactly the kind of transparency that benefits nobody.

Make the doubt something you can put down

The Kanban Guide requires that the rules governing how a work item moves from one stage to the next be explicit, gathered in a Definition of Workflow, and that the state of each work item be visible [2]. That requirement has a useful side effect: a concern addressed to a written rule can be discussed without calling out the person who raised it.

The database migration is covered by an acceptance test, or it is not. The Scrum Guide defines the Definition of Done as the formal description of the state of the Increment when it meets the quality measures required for the product [1]. That definition answers, and its answer is a decision at planning: either the test is missing and you add it, or it exists and the doubt dissolves. Either way, the question is handled with the plan in front of you, at a moment when there are still people around to decide.

What remains is the simplest move: a field on the ticket, with the date and no name. Whether the board is on the wall or in a tool, the mechanics are the same.

“Known risk, November 18, review at Thursday's daily.” The date is enough to bring the doubt back; the absence of a name makes it available. Anyone can pick it up or close it without having to defend its author, and the person who wrote it has nothing to lose if the concern turns out to be unfounded. A signed doubt becomes a position to hold.

The retro to recover doubts from three weeks ago

A team of six finishes a Sprint that went badly. In the retro, the facilitator gives a single instruction, written on the board: “what surprised you during this Sprint?” Five minutes of silent writing, one card per surprise, including for the facilitator. Then reading aloud, without comment.

Of fourteen cards, five are about the same Tuesday: the planning on the 3rd, the migration, the silence. The topic never came up in a Daily Scrum. One card says: “I had a doubt, but everyone seemed sure.” The action decided at the end of the retro fits on one line: the last five minutes of planning are for writing down doubts, not for tidying the room.

Derby and Larsen make data gathering a stage of the retro, distinct and placed before analyzing what happened [3]. In the room, the order changes one thing: what is written in silence attaches to nobody, and the cards can be read without saying who wrote them. A facilitator who opens with a round-robin gets the opposite: the first voice sets the tone, and the others fall in line.

The purpose of the Sprint Retrospective is to plan ways to increase quality and effectiveness [1]. A timeline reconstructed in the retro is enough to find that Tuesday again.

Four moves for the last five minutes

These four moves belong to team practice; the Scrum Guide does not prescribe them.

  1. Replace “any questions?” with a question that asks for a prediction: “what could surprise us in this Sprint?” The wording allows “I don't know” as an answer without losing face.
  2. Wait longer than the silence. Five seconds, then five more. The facilitator counts silently and resists the urge to rephrase in order to fill the gap.
  3. Write the doubt on the relevant ticket, with the date, without a name.
  4. Reserve those minutes in planning. The guide sets a ceiling of eight hours for a one-month Sprint and notes that shorter Sprints shorten the event [1]. The five minutes in question come out of that ceiling, by choice.

One last move, for today: open the current Sprint Backlog and look for the last line written, the one without a name. There is often one. The question is how long you will leave it in a corner of the board before you raise the topic at the next daily.